TXDOT December 2nd Greenville area Weekly Road Report
Greenville Area (Hunt, Rains Counties)
Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.
Hunt County:
SH 11, from FM 2655 to SH 24. This project will add shoulders and replace drainage structures. The contractor has set barricades and is currently widening shoulders and performing ditch grading in the area. Temporary seeding operations have begun on segments of the project and will be ongoing. Hotmix operations have begun and will continue Left Northbound shoulders. Work on intersections and driveways will be ongoing. Also, contractor is grading ditches. Please be aware of workers and watch for work zones when traveling in this area.
FM 1563, from SH 50 to SH 2655: This is a 2.7-mile rehabilitation project that will widen the existing roadway. The contractor has set work zone signs and barricades. Contractor is currently working on bridge guardrail. Contractor continues to perform reclamation work and subgrade widening along with placing GEOGRID in the 2nd mile of project limits. Cement treatment and culver riprap will be upcoming. Driveways are ongoing and are being completed by section of work. Please be aware of workers and watch for work zones when traveling in this area.
FM 2642, from FM 35 to SH 66: The contractor has set work zone signs and barricades. The contractor currently has paving operations and sidewalk operations ongoing. The contractor is grading for a detour near Verandah and Baylor Scott and White and placing sidewalk and backfilling curb in the area. Contractor is forming rebar and working blockouts for driveways near Peppergrass. Inlets placement and driveways are ongoing. Railroad coordination is underway near FM 2642 and SH 66, work has begun in this area. Please be aware of workers and watch for work zones when traveling in this area.
FM 2649, from I-30 to FM 1567. The contractor has set barricades and work zone traffic signs. Cross culvert work is complete. The contractor has finished punchlist and waiting on 70% vegetative establishment in the project limits. Please be aware of workers and watch for work zones when traveling in this area.
FM 512, From SH 34 to FM 118. The contractor has placed barricades and workzone traffic signs. The contractor has begun repair work on base and subgrade failures. The contractor has begun replacing culverts and bridge structures. The first 1.5 miles of reclamation work is underway and the 1st lift of flexbase has been placed along several stations. GEO GRID operations are occurring. Please be aware of workers and watch for work zones when traveling in this area.
I-30 intersection improvements from Monte Stratton to FM 1903. The contractor has set barricades and advance warning signs. The contractor has begun excavation at FM 1903 (West side) and working on placing wire wall at FM 1903 (East side) and soil nail walls at FM 1903.The contractor is also placing embankment & Wire walls east of 1570.along with form work for Bent #3 Cap at FM 1570. Columns are being constructed at FM 1903 and FM 1570 along with the placing of backfill for retaining walls at FM 1570.Pipe/Inlets work for drainage FM 1570 is ongoing. Please be aware of workers and watch for work zones when traveling in this area.
I-30 Improvements from CR2511 to FM 36: The contractor is currently grading and placing embankment between the frontage roads and mainlanes. Contractor poured culvert B headwall and footing, Grading at FM 1565, EB 2511 for temp wall installation and setting barrier on Eb an WB mainlanes from 1565 to end of project limits. Culvert installation is ongoing and detour pavement will be placed throughout the project.
Hunt and Rains Counties Hunt County and Rains maintenance crews will be performing pothole repair work throughout Hunt and Rains County.
Hunt County MNT will be performing overlay from on SH 224 from FM 118 to SH 34, Assisting DPS with lane closure on US 380 and overlaying on FM 1737/ SH34 in various locations
Rains County MNT will continue to address pavement issues SH 19 south and north and repair drainage issues on FM 1564.